Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 1 - 10 of 65 Records

Burlington Dump
Image nop
    • Date Created: 1942-05-23 00:00:00
    • Description: May 23, 1942. This view is taken from the foot of the grade near the entrance to Cat's Island where the roadway changes from a cut to a fill or embankment leading across a small ravine to Cat's Island.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Hayward St. & Hayward St. Sewer
    Image nop
      • Date Created: 1942-01-12 00:00:00
      • Description: January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
      • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


      Burlington Streets: Maple Street
      Image nop
        • Date Created: 1942-06-30
        • Description: Photograph dated June 30, 1942. Original captions reads: Marble Ave. Street Improvement Construction - pavement construction - looking westerly from Hayward St. This view shows stone base ready to receive asphalt penetration. This base is approximately 2 inches in depth over an 8 inch telfold stone base placed on a 6 inch sand cushion. A new 24 inch sewer main was constructed on this block during the latter part of the year 1941.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Business College
        Image nop
          • Description: 1942 Burlington Business College women's basketball team.
          • Parent Collections: Louis L. McAllister Photographs


          Cathedral High School
          Image nop
            • Date Created: 1942
            • Description: 1942 photo of five students standing in front of the Cathedral High School in Burlington, Vermont. Photo #16.
            • Parent Collections: Louis L. McAllister Photographs


            Cathedral High School
            Image nop
              • Description: 1942 photo of Cathedral High School female students with one older woman (seated front row center) assembled on a stage with a large pastoral mural seen behind. Photo #3.
              • Parent Collections: Louis L. McAllister Photographs


              Cathedral High School
              Image nop
                • Date Created: 1942
                • Description: 1942 photo of Cathedral High School students seated on a stage for a group picture. One older woman sits in front row center. A large pastoral mural is seen behind.
                • Parent Collections: Louis L. McAllister Photographs


                Vermont Alumnus vol. 21 no. 08
                Image nop
                  • Creator: University of Vermont
                  • Date Created: 1942
                  • Parent Collections: University of Vermont Alumni Publications, Vermont Alumnus


                  Burlington Dump
                  Image nop
                    • Date Created: 1942-05-23 00:00:00
                    • Description: May 23, 1942. This view is taken from the foot of the grade near the entrance to Cat's Island where the roadway changes from a cut to a fill or embankment leading across a small ravine on the Cat's Island.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Hayward St. & Hayward St. Sewer
                    Image nop
                      • Date Created: 1942-01-24
                      • Description: January 24, 1942. Hayward Street Improvements: This view shows the application of the hot asphalt emulsion being applied into the stone base or binder course. This binder course is approximately two inches in thickness and is laid on top of the eight inch telford stone base which is constructed on a six inch sand cushion. Note the old concrete curbs on the east side of the street and the absence of the curbs on the west side of the street where the undertile drain has been constructed. New integral concrete curb and gutter will be constructed in the spring.
                      • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs