Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 7781 - 7790 of +10000 Records

Burlington Streets: Riverside Ave.
Image nop
    • Description: Undated view of Riverside Ave (1929 or early 1930s?) and an embankment sloping down from it. A timber barrier has been constructed. The Riverside Service Station selling Socony gasoline is seen in the upper right corner. See also mcalA06F13i09 for another view.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Riverside Ave.
    Image nop
      • Description: Undated photo (1929 or early 1930s?) of city street dept crew doing road construction along Riverside Ave. Men work along one side of the road creating a a guard rail like structure.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: Riverside Ave.
      Image nop
        • Description: Undated but may be 1929 or early 1930s view of road construction by the Burlington Street Dept along Riverside Ave. To the right can be seen a portion of the Fairview Garage at 110 Riverside Ave. Two men stand with shovel and other tools near rough stone laid out near the curve of the road. Two jackets are hung on posts nearby. Road construction lanterns (flares) line the edge of the road.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: Shelburne Road.
        Image nop
          • Date Created: 1932-10-21
          • Description: Photograph dated Oct. 21, 1932 looking southerly on St. Paul street from near the corner of St. Paul and Marian Streets. A sign for the Manor House, which was located at 567 St. Paul Street can be seen to the right. Trolley tracks are in the process of being removed. Original caption reads: Widening Shelburne Street.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Streets: Staniford Road
          Image nop
            • Description: This view of Staniford Road shows the final shaping of the pavement materials to a true grade and crown before adding the cement. The material for raising the grade at various points was taken from a sand borrow pit a few yards off the job where a new street was being open for development. Undated but may be 1942.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Staniford Road
            Image nop
              • Date Created: 1942-05-25
              • Description: May 25, 1942. This view shows the curb and gutter construction of Staniford Road looking westerly near the intersection of the proposed street leading into the George Reynolds property at No. 148 Staniford. The intersection can be seen between the two houses. Note the amount of filling necessary to bring the center of the roadway up to the proper grade. The work on the northerly side of the street was completed in Nov. 1941. A special appropriation of $4100.00 was made for the construction, $500.00 of which was for street grading. Work done by Burlington Street Dept.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Staniford Road
              Image nop
                • Description: This view of Staniford Road shows the pavement material in place ready for mixing the cement into the soil. Note the cement bags which have been placed at regular intervals in rows allowing for the proper cement ratio as it is dumped onto the surface for mixing. Work by Burlington Street Dept. Undated but may be 1942.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Staniford Road
                Image nop
                  • Date Created: 1942-10-02
                  • Description: October 2, 1942. Photo No. 21. This view of Staniford Road shows the removal of the header placed at the end of each day's work. Note the planks placed on the surface of the previous day's pavement construction with base material thrown on top of the planks to allow the turning of the equipment. The asphalt distributor is applying water to the sand blotter placed on the surface of the day old completed pavement. Work done by the Burlington Street Dept.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: University Place
                  Image nop
                    • Date Created: 1935-06-13
                    • Description: June 13, 1935. P.W.A. (Public Works Administration) Project No. 2361. Sidewalk construction for University Place - Main Street. To the right is seen the Old Mill.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Winooski Ave.
                    Image nop
                      • Date Created: 1931-10-31
                      • Description: October 31, 1931. View looking south on South Winooski Ave. from Pearl Street. Trolley tracks still visible in the road bed but overhead cable are gone as the trolleys were no longer being used as of 1929. To the left is the First Congregational Church. To the right on the corner is Charles Bombard barber shop at No. 1 So. Winooski. Carl D. Densmore Co. sign for monumental work at 7 So. Winooski. Yandow Tire & Battery Co, Inc. at No. 11 - 15.
                      • Parent Collections: Louis L. McAllister Photographs