Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 3041 - 3050 of +10000 Records

Burlington Street Department Buildings - Equipment
Image nop
    • Date Created: circa 1930s
    • Description: 1930s or 1940s photograph no.2 of a sewer maintenance truck of the Burlington Street Dept.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Street Department Buildings - Equipment
    Image nop
      • Description: Undated photograph of a snowplow in operation.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: Church Street
      Image nop
        • Date Created: undated
        • Description: Burlington Street Department Snow Removal Methods & Equipment This view of Church Street looking south from the intersection of Pearl Street showing the effect of the clear Rock Salt applied to the pavement the previous day. Note the entire absence of snow in the traveled portion of the street, thus elminating the necessity of applying sand for traction purposes. Although the pavement is wet with the salt brine formed from the melting snow it does not create a slippery condition because the tires seem to grip the pavement as the frost is removed from the surface. Retail stores and parked cars line the street. Abernethy Clarkson Wright building is left foreground.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: Cliff Street
        Image nop
          • Date Created: 1938-08-10
          • Description: An operator drives one of the City of Burlington Asphalt Distributor vehicles during the paving construction of Cliff Street at the intersection with Summit(?) Street sign post seen to the right. View is from the top of the street looking down the hill. McAllister studio name embossed in lower right above date. Aug. 10, 1938.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Streets: DeForest Road
          Image nop
            • Date Created: 1932-07-13
            • Description: July 13, 1932 dated photo. #3 DeForest St. 7-13-32. Looking easterly from Pine Grove toward Overlake Park before construction of Telford Stone Base.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Ferguson Ave.
            Image nop
              • Date Created: undated
              • Description: Undated photograph of a paving project on Ferguson Avenue. The road crew can be seen in the distance.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Flynn Ave.
              Image nop
                • Date Created: 1931-04-27
                • Description: Photograph dated April 27, 1931 looking eastward across the rail crossing on Park Avenue (renamed Flynn Avenue) prior to the widening/paving project.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Grove St.
                Image nop
                  • Date Created: 1939-08-15
                  • Description: Photograph is dated Aug. 15, 1939. Original caption reads: WPA [Work Projects Administration] Street Paving Project No. 665-12-2-38(Grove Street) This view shows Grove Street pavement project looking northerly from the Grove Street Bridge after the westerly half of the pavement had been completed. Note the trench at the left where perforated corrugated metal pipe is being installed for underground drainage purposes.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: Hayward St. & Hayward St. Sewer
                  Image nop
                    • Date Created: 1942-05-25
                    • Description: May 25, 1942. Hayward Street Improvements Project. This view is taken from the intersection of Howard St. looking northerly to the intersection of Marble Ave. The excavation of the old pavement was partially done last winter and completed this month after which the sand cushion and telford stone base was constructed and the penetration course of chestnut stone has been spread over the telford base and roughly graded ready for rolling with the 15 ton steam roller. Note the condition of the old curbs which will be reset or replaced as the condition warrants.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Howard St.
                    Image nop
                      • Date Created: 1945-11-09
                      • Description: November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Hayward Street looking westerly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just bieng completed when this picture was taken. Grading between curb and sidewalk on North Side and in back of curb on South side was completed the following day after picture was taken. The 2 inch asphalt wearing surface was placed on a 3 inch penetration macadam with an 8 inch telford stone base. Drainage tile was laid the entire length of the street on the rear of the curbs on either side and in the center line of the street. All tile was drained with catch basins and manholes.
                      • Parent Collections: Louis L. McAllister Photographs