Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 17691 - 10000 of +10000 Records

Burlington Streets: North Street
Image nop
    • Description: Undated but may be 1930 photo looking east of completed repaving project by the Burlington city street dept. of North Street at intersection of Park Street. Seen are 78 North Street and 140 (138) Park Street. More information on this photo can be found on Historic Burlington Project Burlington, Vermont Old North End 1930s and 1940s.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Prospect Street
    Image nop
      • Date Created: 1931-04-25
      • Description: April 25, 1931. Burlington Street Dept. road construction on South Prospect Street near University of Vermont Slade Hall. Banner sign seen to the right warning motorists to drive slow.
      • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


      Burlington Streets: Prospect Street
      Image nop
        • Date Created: 1935-06-13
        • Description: June 13, 1935. P.W.A. (Public Works Administration) Project No. 2361. Curb and gutter construction on No. Prospect Street at "Fern Hill"
        • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


        Burlington Streets: Prospect Street
        Image nop
          • Date Created: 1931-11-14
          • Description: November 14, 1931. Appears to be a photo of finished road construction by the Burlington Street Dept. along a portion of South Prospect Street near UVM's Redstone campus.
          • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


          Burlington Streets: Riverside Ave.
          Image nop
            • Description: Undated photo but may be 1929 or early 1930s showing Riverside Ave. with asphalt resurface completed by the city street dept. View is looking back toward Burlington.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Riverside Ave.(4X5)
            Image nop
              • Description: Undated view of Burlington Street Dept crew paving Riverside Ave. The crew form a line across the road as they spread surface material. A team of white horses stand to the left. The Riverside Service Station is to the right. Billboards line the hillside behind. In the distance is the Fairview Garage.
              • Parent Collections: Louis L. McAllister Photographs,Louis L. McAllister Photographs


              Burlington Streets: Staniford Road
              Image nop
                • Description: This view of Staniford Road shows the completed pavement after a layer of washed sand had been spread over the surface for curing purposes. The small tandem roller in this picture was used for the roller ironing process with followed the initial surface rolling of the ten ton (10 T) tandem roller. Work done by the Burlington Street Dept. Undated but may be 1942.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Staniford Road
                Image nop
                  • Date Created: 1942-10-01
                  • Description: October 1, 1942. Photo No. 3. This view of Staniford Road shows the preparation material at the end of the job with the construction progressing in the background. Detour sign seen to the right warning drivers to drive with care. Work done by the Burlington Street Dept.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: Willard Street
                  Image nop
                    • Description: Undated but may be on or near June 21, 1929. South Willard Street looking north from Cliff St. as construction work was started June 21, 1929 by the Burlington Street Dept.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Willard Street
                    Image nop
                      • Date Created: 1931-03-25
                      • Description: March 25, 1931. Sewer construction by the Burlington Street Dept. on So. Willard St. looking north from the intersection of Shelburne Road near Ledge Road. 1039 feet of 12 inch Vitrified Sewer Tile to be laid. The greater part of the excavation is in solid rock cut varying in depth from 6 inches to 9 feet. Barely visible to the extreme right is a sign for All Saints' Chapel.
                      • Parent Collections: Louis L. McAllister Photographs