Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 17651 - 10000 of +10000 Records

Winooski Bridge Construction
Image nop
    • Date Created: 1928-06-12
    • Description: June 12, 1928. Reconstruction of the Winooski Bridge looking up Colchester Ave on the Burlington side.
    • Parent Collections: Louis L. McAllister Photographs


    Athletics, unidentified
    Image nop
      • Date Created: undated
      • Description: Photograph of the Burlington High School Track and Field Team, 1928 outside of the Edmunds High School building. Pictured are Manager Janke, Litsky, Paul, Ashton, Spaulding, Niles, Stowell, Walter, Dow, Black, Robbins, D. Heath, Colburn, Ide, Gardner, Lapidow, Perry, Ladd, Capt Rice, Coach Tudhope, Zaetz, Cohen, C. Heath, Woodhull. A trophy is seen placed in the front. Some of the members wear a diagonal stripe on their shirts. One member has the letter "V" on his sweater. Slightly different version of photo appears in BHS yearbook Oread 1929, p. 78.
      • Parent Collections: Louis L. McAllister Photographs


      Automobiles
      Image nop
        • Date Created: undated
        • Description: Photograph (no.3) of a SOCONY (Standard Oil of New York) tank truck
        • Parent Collections: Louis L. McAllister Photographs


        Automobile Wrecks & Wreckers
        Image nop
          • Date Created: undated
          • Description: Photograph of a Hope & Son wrecker transporting a tree stump.
          • Parent Collections: Louis L. McAllister Photographs


          Basin Harbor Map
          Image nop
            • Date Created: undated
            • Description: Map titled "Lodge Grounds, Basin Harbor, Vt." shows roads, identifies buildings, and the environs.
            • Parent Collections: Louis L. McAllister Photographs


            Boats
            Image nop
              • Date Created: 1958
              • Description: 1958 photo of sale on Evinrude outboard motor boats seen inside a tent. Flotation cushions and banners are suspended in the background. See also mcalB07F10i03.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Airport
              Image nop
                • Date Created: 1939-11-14
                • Description: November 14, 1939. WPA (Work Projects Administration) Project No. 65-1-12-43. View of extension of north-south runway looking northerly from the north end of the old hard surface section. The crushed stone armor coat in the foreground is nearly ready for the first application of Bitumuls HX quick break emulsion. Work is being carried on preparing the turning area at the extreme north end. This extension is 1,250 feet in length and 100 feet in width. The stone in the foreground has been placed for approximately 650 lineal feet. Hand "spotting" is being done on small areas to insure as near a perfect grade as possible using the stock pile shown at the right in the picture, with rubber tired wheelbarrows for transporting the stone over the surface.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Airport
                Image nop
                  • Date Created: 1937-08-10 00:00:00
                  • Description: August 10, 1937 photo of the back side of the wooden hangar during construction at the Burlington Municipal Airport. Open framework seen in the upper story.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Airport
                  Image nop
                    • Date Created: 1941-08-23 00:00:00
                    • Description: August 23, 1941. Burlington Municipal Airport, WPA (Work Projects Administration) Project. This view is taken on the centerline of the new diagonal runway looking southeasterly from a point near the boundary lights (shown in the foreground) on the easterly edge of the north-south runway area. Note the power shovel and trucks completing excavation of area in the "V" enclosed within the three runways. This area has just been cleared from the growth of small pine trees. The batter boards in the right and left foreground are located over the drainage ditch where the underground corrugated perforated tar coated metal culvert pipes have just been installed. The crew at the left is constructing a concrete catch basin on the drainage system. The grader and asphalt distributor in the background at the left are constructing soil stabilization base.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Dump
                    Image nop
                      • Date Created: 1942-05-23 00:00:00
                      • Description: May 23, 1942. This view is taken approximately at the top of the slope on the southerly shoulder of the proposed roadway leading to the proposed City Dump site on the Intervale. The house shown in this picture is the residence commonly known as the Pomeroy Cottage. The railroad tracks in the background of the picture are the Central Vermont tracks leading to the tunnel. The power line poles at the right in the picture are on the approximate right hand shoulder of the roadway leading down the grade.
                      • Parent Collections: Louis L. McAllister Photographs