Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 15261 - 10000 of +10000 Records

Burlington Streets: Cliff Street
Image nop
    • Date Created: undated
    • Description: View of completed paved Cliff Street looking up the hill. No sidewalks are on either side of the street. McAllister studio name embossed in lower right. No date but may be 1938.
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Colchester Ave
    Image nop
      • Date Created: undated
      • Description: View of Colchester Ave at the site of the Winooski Bridge (not shown but is to the left) crossing the Winooski River. A storefront sign reads 2nd (hand, with a picture of a hand) furniture and stoves. To the extreme left is the Champlain Mill.
      • Parent Collections: Louis L. McAllister Photographs


      Burlington Streets: Colchester Ave
      Image nop
        • Date Created: 1929-10-19
        • Description: Oct. 19, 1929 dated photo of upper Colchester Ave showing street department repaving road work with concrete slabs. More information on this photo and related images can be seen on UVM's Historic Burlington Project web site.
        • Parent Collections: Louis L. McAllister Photographs


        Burlington Streets: Colchester Ave
        Image nop
          • Date Created: 1929-09-01
          • Description: Sept. 1, 1929 dated photo. Colchester Avenue looking toward East Avenue as it appeared just before construction work was started. This picture was taken at the entrance to Green Mount Cemetery. Note the edge of the manhole in the left foreground of the picture also note the rough and wavy condition of the old pavement due to successive surface treatments and cold-patch under heavy traffic. Note the old car tracks on the left which are to be removed.
          • Parent Collections: Louis L. McAllister Photographs


          Burlington Streets: Colchester Ave (4X5)
          Image nop
            • Date Created: 1929-09-01
            • Description: Sept. 1, 1929 dated photo. Colchester Ave. north of Chase Street showing the 12% grade between Chase Street and Barrett Street and the approach to the new Winooski Bridge. Textile mills seen in distance. Note the rough condition of the pavement in the foreground as well as the irregular appearance of the curb line. This picture taken just before repaving construction work began. Dwellings numbering in the 400s seen to the left. On the right is No. 6-8 Chase Street, Dan Day Brick Store. Just beyond is 445 Colchester Ave. A similar undated photo with more information on the houses can be found on UVM's Historic Burlington Project web site.
            • Parent Collections: Louis L. McAllister Photographs


            Burlington Streets: Elmwood Ave.
            Image nop
              • Date Created: 1931-08-28
              • Description: August 28, 1931 dated photo. Construction crew works repaving the street. Sign atop one of the vehicles identifies it as belonging to the City of Burlington Street Dept.
              • Parent Collections: Louis L. McAllister Photographs


              Burlington Streets: Elmwood Ave.
              Image nop
                • Date Created: 1931-09-27
                • Description: Sept. 27, 1931 dated photo. View of Elmwood Ave at the intersection of North Street. Elmwood Ave Cemetery on the left. Retail businesses on the right include a drug store, place to eat lunch and convenience store. Steeple of St Joseph's Church on Allen Street seen in upper right corner.
                • Parent Collections: Louis L. McAllister Photographs


                Burlington Streets: Grove St.
                Image nop
                  • Date Created: 1940-02-03
                  • Description: Photograph dated Feb. 3, 1940. Original caption reads: WPA (Work Projects Administration) Project No. 665-12-1-38 This view is shows the completed project in the area adjacent to the bridge on Grove Street looking in a northerly direction from a point opposite the entrance to the W.C. Kirby Garage. Note the easy back slope on the shoulders of the excavated portion of the improvement in the background; also the stone dust surfacing of the sidewalks on both sides of the street as well as the asphalt armor coat surface on the pavement.
                  • Parent Collections: Louis L. McAllister Photographs


                  Burlington Streets: Hayward St. & Hayward St. Sewer
                  Image nop
                    • Date Created: 1942-01-12
                    • Description: January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
                    • Parent Collections: Louis L. McAllister Photographs


                    Burlington Streets: Hayward St. & Hayward St. Sewer
                    Image nop
                      • Date Created: 1942-01-12
                      • Description: January 12, 1942 Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
                      • Parent Collections: Louis L. McAllister Photographs