Showing 711 - 720 of 1092 Records
Vermont Structural Steel
-
Image nop
- Date Created: 1951
- Description: 1951 Interior view of the Vermont Structural Steel plant on 207 Flynn Ave, Burlington, Vermont.
- Parent Collections: Louis L. McAllister Photographs
Vermont Structural Steel
-
Image nop
- Description: View of the framing of a metal structural building with an automobile (convertible (?) with white wall tires) parked in front. 1951.
- Parent Collections: Louis L. McAllister Photographs
Webb Estate (Shelburne, VT)
-
Image nop
- Description: Photo of an artist's rendering of the Webb estate.
- Parent Collections: Louis L. McAllister Photographs
Webb Estate (Shelburne, VT)
-
Image nop
- Description: Photo of an artist's rendering of the Webb estate.
- Parent Collections: Louis L. McAllister Photographs
Winooski Bridge (4X5's)
-
Image nop
- Description: View of the Winooski Bridge looking toward the Champlain Mill and showing the rocky ledges and water falls of the Winooski River. Undated but may be 1928.
- Parent Collections: Louis L. McAllister Photographs
Burlington Airport
-
Image nop
- Date Created: 1937-08-10 00:00:00
- Description: August 10, 1937 photo of the back side of the wooden hangar during construction at the Burlington Municipal Airport. Open framework seen in the upper story.
- Parent Collections: Louis L. McAllister Photographs
Burlington Lakefront
-
Image nop
- Date Created: 1932-12-20 00:00:00
- Description: December 20, 1932. This photograph of the Burlington lake front is captioned: "Outfall end of new trunk line sewer. Old sewer shown on extreme right," Picture also shows brick building with smokestacks, automobiles, and railroad cars.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Barrett Street
-
Image nop
- Date Created: 1941-06-19
- Description: Photograph dated June 19, 1941. Original caption reads: "Barrett Street Improvements: This view shows the condition of Barrett Street as the general improvements were started including new concrete integral curbing and gutter on both sides, concrete sidewalk on the northerly side and telford stone base with asphalt penetration binder course and asphalt hot plant mix wearing course. This improvement also included the raising, moving and construction of a new reinforced concrete basement wall and chimney for the Rossetti residence shown in the left background of this picture nearly opposite the concrete mixer. The crew in the foreground are starting the installation of the underground drainage tile and concrete integral curbing and gutter at the intersection of Colchester Avenue.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Barrett Street
-
Image nop
- Date Created: 1941-09-05
- Description: Photograph dated Sept. 5, 1941. Original caption reads: Barrett Street Improvements: This view shows the Rossetti residence in progress of being raised. Note the condition of the sill and the studding of the sidewalls; also note that the sidewalls are filled with brick and mortar in the spaces between studdings. This added considerable weight to the structure and with the rotten condition of the sills (the sill in the right foreground having been entirely gone and the sill shown in the picture is a new timber which had to be put in place before the house could be raised) made the raising process difficult.
- Parent Collections: Louis L. McAllister Photographs
Burlington Streets: Barrett Street
-
Image nop
- Date Created: 1931-08-04
- Description: Photograph dated Aug. 4, 1941. Original caption reads: Barrett Street Improvements: This view shows the Rossetti residence before any reconstruction work was started with the exception of the placing of the forms and pouring the sub-footings for the northerly half of the reinforced concrete foundation walls.
- Parent Collections: Louis L. McAllister Photographs