Note: Put the word between quotation marks (“example”) to perform an exact search.

Showing 61 - 70 of 159 Records

Bridges: Unidentified
Image nop
    • Date Created: undated
    • Description: Laying pipeline in channel through ice beneath metal bridge
    • Parent Collections: Louis L. McAllister Photographs


    Burlington Streets: Mill St.
    Image nop
      • Date Created: 1941-11-01
      • Description: Photograph dated Nov. 1, 1941. Looking westerly, the bridge crossing the Winooski River can be seen. Original caption reads: Mill Street, Burlington, Vermont showing completed job. American Bitumuls Stabilizer being used for 4 1/2" stabilized base on which a 2" penetration armour coat has been constructed. The sidewalk at the right was constructed with soft coal cinders and stabilized with Bitumuls Stabalizer.
      • Parent Collections: Louis L. McAllister Photographs


      Winooski Bridge (4X5's)
      Image nop
        • Description: November 26, 1928. New Winooski Bridge taken from corner of Barrett St. and Colchester Ave. Overhead trolley lines and trolley tracks in the pavement can be seen.
        • Parent Collections: Louis L. McAllister Photographs


        Winooski Bridge Construction
        Image nop
          • Description: View of where the Winooski Bridge was swept away in the 1927 flood. Still much debris seen. View is looking across the river up Colchester Ave on the Burlington side. To the far right no longer is seen the Johnson Grain Co. building as it has been torn down.
          • Parent Collections: Louis L. McAllister Photographs


          Winooski Bridge - Opening Ceremonies (4X5's)
          Image nop
            • Date Created: 1928-08-04
            • Description: August 4, 1928. Dignitaries sit in a row on the newly built Winooski Bridge during the opening ceremonies. The mayor at the time was William H. Girard.
            • Parent Collections: Louis L. McAllister Photographs


            Winooski and Burlington Mills (from Pontoon Bridge)
            Image nop
              • Date Created: 1928-05-05
              • Description: May 5, 1928. Seen here are men of Company D, 1st U.S. Engineers, 2nd Corps standing on the pontoon bridge that spanned the river between Burlington and Winooski. Behind is the old mill in Winooski that was a branch of the American Woolen Company.
              • Parent Collections: Louis L. McAllister Photographs


              Winooski Bridge Repair
              Image nop
                • Date Created: 1943-06-02
                • Description: June 2, 1943. On the Winooski Bridge under repair. Champlain Mill to the right. View toward Winooski.
                • Parent Collections: Louis L. McAllister Photographs


                Winooski and Burlington Mills (from Pontoon Bridge)
                Image nop
                  • Description: Undated but part of May 5, 1928 panorama. Seen here are men of Company D, 1st U.S. Engineers, 2nd Corps standing on the pontoon bridge they helped build that spanned the Winooski River between Burlington and Winooski. Behind is the old mill that was a branch of the American Woolen Company.
                  • Parent Collections: Louis L. McAllister Photographs


                  Bridge at King's mill place, Burlington and Essex, September 20, 1831
                  Image nop
                    • Creator: Johnson, John, 1771-1842.
                    • Date Created: 1831-09-20
                    • Parent Collections: John Johnson Collection


                    Bridges, Potash Brook
                    Image nop
                      • Date Created: 1928
                      • Description: Construction of bridge improvement, Potash Brook, South Burlington
                      • Parent Collections: Louis L. McAllister Photographs